A Review Of shane braniff west kelowna
Pointing to an Oct 2023 Ministry of Transportation and Infrastructure report stating that WR Bennett bridge is anticipated to max out at capacity by 2040, Rustad reported the timeline to incorporate A different crossing needs to be moved up.Due to the distinctive microclimate on the Ards Peninsula, along with the loaded soil, the weather conditions